6 bus lines resumed operation at JiNan Railway Station square
yesterday, 3 Road, 9 Road, 11 road, 18 road, 43 Road, K51 Road, and other 6 bus lines resumed in the railway station square operation.
at 5:30 on the morning of 30, a 3 bus stopped slowly in front of the bus stop on the station street, becoming a bus for the first half of the year to move into the railway station square except the first brt5 line.
5:30 in the morning, a 3 bus stops at the bus stop in front of the station, waiting for the passengers to get on and off. Mr. Sun, who is walking down the bus, is going back to his hometown in Yantai by train. As soon as he got off the car, he told reporters with emotion, "I live near Jiefang Bridge. Last year, I can't go home in the last year. I have to carry several hundreds of meters, and now we don't have to go again." Mr. Zhao, who has the same feelings with Mr. Sun, said: "when I got on the bus, I thought it was impossible to get into the railway station. When I arrived at the South Station of Tianqiao, the driver told us that we could enter the railway station, so it was more convenient to take the train."
some of the passengers who just got off the train went to the station street bus stop to see the bus that had been missing for a long time. "Well, you see, the bus is coming in again." "Yes, you don't have to walk a lot more." Almost all the passengers are calling the bus back to the railway station square. Speaking of the resumption of the bus station, the passenger Ms. Lu said: "in the railway station such a large area of passenger flow, the relevant departments should be as convenient as possible, let the people take less road, the bus station is a civilian move."
reporters at the scene saw that after the bus returned to the station, the passenger flow was stable and the traffic order of the railway station square was relatively normal. The responsible person of the city bus general company introduced, the first day of the resumption of the station, they sent more than a hundred staff to the bus stop to guide passengers, dispatching buses, maintaining the order of the bus. The Ji'nan Railway Bureau and the Ji'nan bus general company decided that the next step would be to install the guardrail in front of the bus stop of the station street, optimize the bus stop, and set up the bus lane to evacuate the passengers in order as soon as possible.