Re: Ji'nan's middle water station can save 2.7 Daming lakes in one year, but the cost is high.
water in the Tiangong lake is handled by the next station. Newspaper reporter Wang Huang
the water station has a high cost to kill the human head pain
18 day, more than 50 development and construction and property management enterprises to the mountain Daxing school district water station and Luneng lead city water station in the city. Most of them are equipped with construction projects for construction or running projects. In addition to the construction of a large urban sewage treatment plant beside the Xiaoqing River, the water facilities must be built up to a certain scale from 2003 to a certain scale. In 2006, the construction of water-saving facilities in Ji'nan has been incorporated into the procedure for examination and approval of the urban construction projects. The water-saving facilities of the construction projects in Ji'nan are changed from post management to construction graphics. The newly built public buildings with a single building area exceeding 20 thousand square meters are all equipped with reclaimed water facilities. Ji'nan city and Rural Water Bureau of the relevant responsible person introduced, as of now, Ji'nan has built a total of 406 water facilities, the daily processing capacity of 346 thousand and 200 cubic meters, the daily amount of water back about 131 thousand cubic meters. At present, Ji'nan's reclaimed water facilities are ranked the highest in the country.
developers and property developers at the scene are most concerned about the investment and operation cost of water station construction. Yan Jingbai said that the two central water stations in the city and the Xinlong city are the upgrading projects. Because they are in the pilot area of the sponge City, they are required to meet the emission standards according to the requirements. Through the PPP model, the Ji'nan City Construction Group has invested and operated for 15 years. At present, the investment in the city of Luneng show is about 40 million yuan, including both underground civil and various processing facilities. However, the operation of the two water stations is not paid by the developers and schools, and the earlier agreement is that the schools and the developers are free to use the treated water.