Ji'nan start pollution control next year to let the Xiaoqing River thoroughly
source: Qilu Evening News and Qilu one point reporter Liu Yafei intern Liu Xiao
as the only drainage channel across Ji'nan City, Xiaoqing River is both the landscape of northern Ji'nan, but also the assessment of Shandong and Ji'nan. One of the most important rivers. In recent years, Ji'nan has intensified the pollution control of the Xiaoqing River. The water quality of the Xiaoqing River has been obviously improved compared with that before, but there is a big gap with the requirements of the action plan for water pollution prevention and control ("ten water"). Therefore, on the 2 day, Ji'nan launched the Xiaoqing River pollution control tackling key, and the goal is to achieve the full completion of the exit section next year.
compared with the comprehensive regulation, the landscape on both sides of the Xiaoqing River has been greatly improved, but the water is still not clear enough. Among them, the Xin Qing Feng section of the Xiaoqinghe River is the national control section, and its water quality has not been able to meet the requirements of environmental functional zoning. In 2016, according to the grade V standard of the national standard of surface water environmental quality, the water quality of the 1 sections of the Xiaoqing River in Shandong province has not reached the standard (ammonia nitrogen and total phosphorus exceeding the standard) in the 1 sections of the 100 provincial control sections of the province.
in order to make the Xiaoqing River clear completely, in April 17th, the executive meeting of the Ji'nan municipal government examined and passed the action plan for the action of pollution control and harnessing in the Xiaoqing River Basin, which required the water quality of the Xiaoqing River in Xiaoqing River to reach the grade V standard of the surface water in 2018.
it is not an easy task to achieve this standard. Ji'nan has refined the work of tackling key problems. In the capacity of urban sewage treatment, Ji'nan will fully promote the expansion projects of the first and two factories of the China Guangda water service. It will push forward the new projects such as the water purification plant of the La Shan area and the water purification station of the Dali gully, the Zhao Wang River and the Huashan water quality station, and will accelerate the upgrading of the 11 middle water treatment stations in the urban area to ensure the new project by the end of June 2018. The capacity to increase sewage treatment is 293 thousand tons per day. At the same time, the municipal public sector should speed up the connection of the two plant, the first plant and the three plant, and the Tianqiao District and the riverside group should complete the inverted siphon project of the siphon trunk of the Qinghe North Road as soon as possible.
the black odor water body in the built-up area seriously affects the life of urban landscape and surrounding residents. To this end, Ji'nan will further implement the responsibility of the main governance and study the measures and measures. At the end of this year, the 31 black and stinky water bodies are basically completed in the urban area, and the black and smelly water bodies are controlled within 10%.
at the same time, it will also combine the reconstruction of the village in the city, the control of the black and smelly water body, the construction of the comprehensive corridor and so on. Before the end of June 2017, 3 rainwater culverts, such as the South Taiping River, on both sides of the Xiaoqing River main stream are completed.
in the comprehensive management of river ecology, various districts and counties and related units have also recovered their tasks. Among them, the Zhangqiu district government should ensure that the water quality in 2017 reaches the class V standard of surface water and the elimination of inferior V water according to the overall deployment of the municipal government. The Ji'nan municipal public administration should speed up the comprehensive ecological management of the main tributaries of the Xiaoqing River, such as Xingji River, Daxin River, Han Canghe and North Taiping River. Before the end of June 2018, the Binhe group and the Municipal Water Conservancy Bureau should complete the ecological dredging of the Xiaoqing River section.