There is no definite time to restart the Ji'nan Yellow River tunnel project.
source: Life Daily reporter Wang Xi
, Jia Yuliang, director of the Ji'nan Municipal Planning Bureau, said when he was a guest hotline for the 12345 citizens, the project is expected to be restarted. At present, the project is carrying out the construction subject, but the construction time series It's not yet confirmed.
each time the bridge reminiscent of the floating bridge
from the 19 day, the water diversion and sand regulation of the Xiaolangdi Dam began to start, and the demolition of a dozen floating bridges in Ji'nan has also been dismantled at any time. Especially in the urban area of Ji'nan, every floating bridge will cause great inconvenience to residents on both sides of the Yellow River.
will remind people of the Yellow River crossing project that has been shouting for many years. It is understood that many years ago, in order to better achieve the "North span", Ji'nan once put forward the "nine bridges and one tunnel" pattern of cross yellowing, among which, the construction of the Yellow tunnel at the current floating bridge has attracted much attention.
according to the previously published data, the Yellow tunnel in Ji'nan is the first civilian wearing yellow tunnel in China. According to the original design concept, the Ji'nan tunnel is wearing the Yellow tunnel in the south of the tunnel, and the 309 National Road is connected to the north, which is a double hole four lane, and the speed of the design is 60 kilometers per hour. After crossing the Yellow tunnel, it will take only about 4 minutes for the citizens to cross the Yellow River, and they will also be open to traffic free of charge.
it was said last year that the Yellow tunnel was canceled
in recent years, the news of building the Yellow tunnel in Ji'nan was all over the ear. However, last year there was news that the plan for the Yellow tunnel was cancelled, and the plan for crossing the bridge across the Yellow River was also on the agenda.
last August, on the website of the Ji'nan municipal government, a message was posted on the website of the city government in August. In response to the consultation of the public, the relevant departments said that, after the municipal leadership and the expert group discussed it, because of the upper river in the Yellow River, such as erecting a yellow tunnel, it would bring security risks on both sides of the Yellow River, because of this, the plan for the construction of the Yellow tunnel was cancelled.
at the same time, the relevant departments also said that in order to develop in the future, Ji'nan will put the plan of building bridges on the agenda.
for this news, the Ji'nan Municipal Committee of the Chinese people's Political Consultative Conference (CPPCC) and the director of the Ji'nan the Yellow River River Affairs Bureau Xu Jianzhong also said during this year's Ji'nan city two meetings that the technology in the Yellow tunnel was already very mature. After the plan was reported to the national Huang Committee, it was finally agreed, but it was also worried about the security problem.
yellow tunnel project is expected to restart
but, on the 20 day, Jia Yuliang, director of the Planning Bureau of the Ji'nan City, disclosed that in order to accelerate the development of the Longhu project in magpie mountain, the project will be restarted in the Yellow tunnel project, and the construction subject is being carried out.
in an interview with reporters, Jia Yuliang said that technically, there is no problem in wearing yellow tunnels, and the safety problems can also be effectively solved.
before, Xu Jianzhong, director of the the Yellow River River Affairs Bureau of Ji'nan City, also mentioned in the media interview that the road traffic engineering across the Yellow River must not be built. Because the bridge is many, it will also have the hidden dangers of flood control. To disagree with the construction of a yellow tunnel, the main fear of water pervious accidents, Xu Jianzhong once said that, in fact, the water down, can be blocked, plugging, can be cited, technically there is no problem.
, however, Jia Yuliang said that the main body of the construction of the Yellow tunnel is still being implemented, and it has not been finalized. Therefore, the construction time and other construction timing problems are not yet well established.