Spring irrigation of farmland in Ji'nan has started 1.25 million tons of the Yellow River water moistening "Ji'nan granary".
http://sd.sdnews.com.cn/jinan/201303/t20130324_1155846.htm
reporter
today, the reporter of the Ji'nan Daily reported that the "Ji'nan granary" spring irrigation task of Xing jiand Huang irrigation area has opened and released. This year its water diversion index is 125 million cubic meters, the water is filled, and the 1 million 180 thousand mu of farmland in the irrigation area will be effective. Irrigation. At the same time, Tianshan Irrigation District, which is responsible for agricultural irrigation in Pingyin, has been well prepared for irrigation. This marks the spring irrigation of farmland in our city has been carried out in succession.
xingjiazu Yellow River irrigation area is responsible for the irrigation task of two counties in Tianqiao, Jiyang and Shanghe, of which Jiyang and Shanghe are called "Ji'nan granaries". According to the relevant person in charge of irrigation district management office, due to more rainfall this year and good soil moisture, the spring irrigation work in the Yellow River is somewhat later than last year. At present, the amount of water in the Yellow River is relatively small, the discharge volume of irrigation area is 13.38 cubic meters per second, the temperature is relatively low recently, and the the Yellow River water will be mainly used for pressure reduction. According to the Jiyang County Water Bureau staff, according to the farmers' watering habits, the general irrigation temperature is above 10 degrees Celsius. After two days of cooling, it is estimated that full irrigation will have to wait for the temperature to rise. According to the Shanghe County Water Bureau staff, the water diversion time is two weeks to a month, to the middle of April the first spring irrigation will end.
according to the introduction, in order to ensure the safety of water diversion, Xing jiand Huang irrigation management department has formulated the "spring irrigation plan for 2013 years" and detailed management system and water diversion plan. At the same time, it arranges the special person to clean up the canal head and some channels, remove the water blocking buildings, repair and seal the damaged gate, test and test the test. Water equipment. Tian Shan irrigation area will also strengthen the inspection in the water diversion process, 24 hours on duty, set up a rescue team, equipped with emergency equipment and vehicles, handling all kinds of emergency problems in time, to ensure that the embankment does not break, the gate is not damaged, the building is not out of problem, to ensure the safety of water diversion.