Ji'nan award winning pedestrian bridge design scheme maximum bonus of 30 thousand yuan
Shandong news network February 27th news (reporter Pang Yanjun) reporter today from the Ji'nan Municipal Public Utilities Bureau learned that Ji'nan will first pass the competition way to collect the pedestrian bridge bridge type design scheme. The first batch of four Tianqiao bridge, the bridge of the Central Hospital, the bridge of the Central Hospital of Jiefang Road, the Carrefour bridge of the Lishan Road, and the bridge of the intersection of the street corner of the source street are to participate in the competition. The design period is from February 28th to March 14th. The first prize for each flyover is $30000.
it is reported that the design period will continue until March 14th when the competition is enrolment until March 4th. All the units, individuals and social organizations who care about the urban construction and footbridge construction in Ji'nan can participate in this competition. Each Tianqiao set a first prize, the bonus is RMB thirty thousand yuan, the two prize is two, the bonus is RMB 10000 yuan, the three prize is two, the bonus is RMB yuan yuan, the outstanding prize is a number of names and the bonus is one thousand yuan RMB.
at the same time, on the basis of previous investigation, the Ji'nan Municipal Public Utility Bureau has identified the "list" for the first batch of pedestrian overpasses this year. This year, we will take the lead in starting the construction of pedestrian overpass in 6 places where the construction conditions are ripe. They are near the square of the Black Tiger Spring Road, near the Museum of the ten East Road Province, between the seven road experimental middle school and the Yuying middle school, the road intersection of the source street, the entrance of the Central Hospital of Jiefang Road and the Carrefour of the calendar mountain road. Among them, the black tiger spring West Road Heng Lung Plaza pedestrian bridge and the Provincial Museum flyover are restricted by the surrounding environmental conditions, and no commercial advertisements will be established in principle. The two bridge type scheme has been confirmed, the Provincial Museum flyover has been started, and the pile foundation construction is being carried out, and it is planned to be completed before May 1st. The bidding for the Hang Lung Plaza flyover is currently under construction. It will start construction before the end of March and will be completed in July 1st. The 4 flyovers, such as Wen Road junction, will be selected through the project design competition and selected by the relevant departments. After the research and determination of the relevant departments, we will strive to start construction early, and the plan will be completed after July.
the expected construction number of our pedestrian bridge this year is to guarantee 6 of the 8 hopes 10. On the bridge of the newly built pedestrian bridge this year, we will engrave the name of the bridge construction unit and the design unit, let the Tianqiao witness the glory of the designer and the builder. Han Yongjun, deputy director of Ji'nan municipal public administration, told reporters.
4 flyovers will be presented in front of everyone, and the general public will pay close attention to the progress of the activities, and the "answer" will be announced after March 15th.