Ji'nan 1 billion 300 million new three largest water plant Nankang water plant completed by the end of the year
source: the world city editor
reporter learned from the Ji'nan urban and Rural Water Bureau, Ji'nan has started Nankang water plant, East Lake water plant, tourist road water before heading The total investment of 3 waterworks, such as the factory, is about 1 billion 300 million yuan. The Nankang water plant has been built in the end of March this year and completed by the end of 2018. The daily water supply capacity is 110 thousand parties.
the southern Fujing Jiayuan district is difficult to eat water in the three big water factory, the water supply pattern of Ji'nan is difficult to be based on the water supply pattern in the south city of Dongcheng. The urban water supply mainly comes from the the Yellow River water in the West and the north, and the southern part of Ji'nan mainly depends on the lying down. Hushan Reservoir, Jinxiu Chuan reservoir and other water supply, the peak of summer water consumption each year, the eastern city and Nancheng area may have low water pressure. With the planning and construction of the new and old kinetic energy conversion demonstration area, the international medical center, the north and the south area and the Wen brigade City, the demand for water supply in the southern and eastern parts of Ji'nan is increasing rapidly. Chen Peng, a senior engineer of the water supply department of Ji'nan urban and Rural Water Bureau, has already fully started the Nankang water plant, the East Lake water plant and the tourist road. The total investment of 3 Waterworks in water works is about 1 billion 300 million yuan.
East Lake water plant is located in the east of the airport road of the calendar district and north of Wen Liang road. The design water supply is 200 thousand cubic meters per day and the total investment is 523 million 900 thousand yuan. After the completion of the waterworks, the water works mainly serve the airport Economic Development Zone, Tang Ye, Sun Village, Guo Dian and two river areas to ensure the development of the eastern urban area and provide water supply guarantee for the future high and new industry belt. Located in the east of the city, west of Han Canghe and the south of the tourist road, the water plant is designed to provide 200 thousand cubic meters per day for water supply, with a total investment of 618 million 50 thousand yuan. After the completion of the waterworks, it serves the tourist routes, covering Shuangjing, Longdong, Han Yu, Lotus Hill, Zhang Jin, colored stone and zhuangke, to solve the water source in the southeastern part of the city. The problem of shortage of feet and facilities. Nankang water plant is located in the east of North Kang Road and west of Nankang Road, the Central District of the Central District of the city. The planned land area is about 2.11 hectares, and about 31.65 mu. The main renovation and expansion of the existing Nankang pre processing plant, the expansion of the water supply to 110 thousand cubic meters per day, and the total investment of 170 million 730 thousand yuan. Its water source is also from the supine tiger mountain reservoir. At present, the Nankang water plant has been built, and the water supply conditions are set up by the end of 2018; the tourist road water plant is planned to be completed by the end of September 2019; the East Lake water plant is planned to be completed by the end of December 2019. At the end of the Nankang water plant, the problem of water use in the southern periphery of the second ring was completed at the end of the year. It was understood that the development degree of the land in the water supply area in southern Ji'nan has been continuously improved, and the construction projects and the proposed projects are numerous, such as the China shipping area, the show city, the Wen Zhuang, the Hsin long, the North South Kang and so on.
with the development of the region, the south of the second ring will attract a large number of residents and office workers, which will lead to a sharp increase in water demand in the region, and the shortage of water supply is becoming more and more prominent. It is understood that Fujing Jiayuan district is using self well water supply, water quality is not good, and often the situation of water supply at night. With the completion of Nankang water treatment plant at the end of the year, the problem of poor water quality and no water will be solved. At the same time, it can also reduce residents' exploitation of groundwater and play a certain role in protecting springs.