Ji'nan's 12 construction waste dumps will be filled with recycled cards next year.
source: Ji'nan daily Author: Chen Jiabao Jia Xiangyuan Zhu he
in the roar of the crusher, construction waste is crushed Again, the appearance of earth, stones and stones appeared on the ground. This morning, at a construction site in the big Han valley of the hi tech Zone, the reporter followed the staff of the Municipal Administration Bureau to see the scene of building waste being transformed into stone. This is one of the few construction waste utilization points in our city at present.
mobile crusher processes construction waste into aggregate.
with the accelerated pace of urban construction, a large amount of construction waste is produced, which is difficult to digest. It is reported that since 2009, construction waste in our city has increased at an annual rate of 30 million cubic meters, and most of the disposal methods are single mode such as backfilling and burying. Since this year, the dismantling and dismantling efforts have increased, construction waste is increasing, and the current 12 construction waste dumping ground in our city is facing the serious situation of "feeding". The problem of the utilization of construction waste resources is imminent. However, due to factors such as policy and market, the development of construction waste utilization enterprises in our city is difficult and difficult.