Ji'nan fully implements river system and basically eliminates black and stink at the end of next year.
2013, Ji'nan water conservancy ushered in two major events: to carry out the first water ecological civilization in the country and to carry out the river length system in the city's 192 rivers. These two things are an important measure to carry out the strategic deployment of the party's eighteen major "vigorously promote the construction of ecological civilization", and also an opportunity for the development of water resources in Ji'nan.
3 years later, in 2016, the two major events were done by the Jinan people:
in November 7, 2016, the Ministry of water resources and the Shandong provincial government jointly convened the acceptance meeting of the pilot project for the construction of the water ecological civilization city of the city of Shandong. The medal system has been implemented for 3 years, and the river water has been cleared and the river is flowing. The name of each river is also deeply branded in the hearts of the local people.
the theme of this year's 3.22 "World Water Day" is "implementing the concept of green development and implementing the river length system in an all-round way". The construction of water ecological civilization in Ji'nan has never stopped and the promotion of green development has never ceased. And the long river system that our city has been carrying out will also link up with the national plan this year, formulate a brand new target and have a "big move" on the deployment.
the construction of the national water ecological civilization city for the implementation of the ramming foundation of the river long system
Ji'nan in 2013 at the same time put forward the establishment of the national water ecological civilization city, the implementation of the river length system is not unreasonable, the construction of the water ecological civilization City has laid a solid foundation for the implementation of the river length system.
in the construction of the national water ecological civilization city, in the process of building the "urban spring landscape area", the water system management and water landscape building were carried out on the Xingji River and Yuxi River, and the river bottom clearing and the water storage dam were set up to realize the water storage, and the coastal construction green belt, the walk path, the guardrail, and the coastal construction were carried out. Hydrophilic platform and so on. The flood control function of the river after the treatment is more complete, and a more perfect flood control system has been set up to achieve high flood control capacity and reduce the flood control and flood control pressure. At the same time, with the pollution control, "waterscape" presents, the river from simple flood control, drainage function to provide safe, comfortable, beautiful water environment for the public at the same time, the disappeared years of fish, birds and other ecological species reappear, clean air, improve the small climate, let the residents in the noisy urban atmosphere to experience the tranquil. The peaceful mood of leisure.
the clearer the water, the less willing it is to pollute it, and the consciousness of the citizens also gives the river more power to work. At the same time, in the process of creating a water ecological civilization city, our city innovatively implemented the "one river, two person" river ecological protection system. The first selection of the two important rivers of the Xiaoqing River and Yufu River, publicly selected public figures with social influence as the spokesman of the river, signed the appointment book, and advocated the public protection of the water ecological environment. This exploratory action has raised the public awareness of the river length system, and let the river become the first person to reflect the problem of river pollution, and lay the foundation for the overall implementation of the river length system in the future.
three stages and three steps to carry out the river length system
to realize "water clear, river smooth, Jing Mei, spring"
"we have carried out the river length system before we have only one goal, which is to manage the river well, not to be polluted, to ensure the smooth flood of the river. And this year, the national implementation of the river length system is more than this one. There are six major tasks. Therefore, we will have more requirements and deployment of the river length system in the future. The relevant person in charge of the Water Conservancy Bureau of Ji'nan city is introduced.
it is reported that Ji'nan has carried out the ultimate goal of the river length system in an all-round way. It is through continuous efforts to build the ecological landscape corridor, which is a landscape dependent, a stream connected, a green water loop and a luxuriant forest.
in order to achieve this goal, the city will be divided into "three stages": in 2017, the river length system is fully implemented in the city, and the city, county, township and village four level river length system is set up, and the system of clear responsibility, coordination and orderly, strict supervision and powerful protection of the river bank management and protection system and the benign operation mechanism
2018 At the end of the year, the "eight disorder" phenomenon was basically eliminated, such as chaotic construction, disorder, disorderly excavation and disorderly arrangement. The small and medium rivers in the city basically eliminated the black odor, the water area only increased, the water quality improved effectively in 2020, and the loss of use function (inferior V) water body was basically eliminated.
corresponds to the construction node. The "three step" strategy is implemented in the concrete work of the river length system in our city:
2017 is a year of comprehensive investigation and foundation, and the city will complete the system of river length system and establish a benign operation mechanism. At the same time, we will carry out basic work to complete the compilation of the management plan for the key river channels and important river banks, and start the river library demarcation. And carry out the river bank problem investigation work, find out the bottom.
2018 is a year of system renovation. On the basis of this, the task index is decomposed, supervision and inspection are carried out, and the principle of "department sub item responsibility, river long run overall assessment" is strictly examined to ensure that all the work tasks fall into reality. We should start the implementation of the Qinghe action with the theme of "cleaning rivers, eliminating illegal construction and cleaning up illegal activities". To carry out the key regulation of urban and rural river banks, we should systematically handle the non-point source pollution of rural river banks and the remediation of urban black and odorous water bodies.
in 2019, on the basis of the previous two years' work, it was consolidated and improved, that is, the river bank water order is on the right track. After the ecological system of the river bank is basically restored, the management and protection of the river bank are regulated by the establishment of the system, the healthy life of the river bank and the sustainable utilization of the river bank are maintained. "
the chief executive of the Party committee or government is the chief leader of the Party committee or the government for
" before we carry out the river length system. The head of the river is the main leader of all districts and counties. This is more powerful, and the head of the general River is held by the principal and responsible comrades of the Party committee or the government. " The relevant person in charge of the Municipal Water Conservancy Bureau said. The city, district (county), town (street) Party committee and main leadership of the government serve as the chief river head of the administrative region, and the relevant leaders serve as the river river in the administrative area, and promote the establishment of the four level river length organization system of city, county, township and village.
specifically, the city level river length is set up in 5 provincial canal river channels and 8 municipal pipe rivers, and the leaders of the county (District) leading the river, respectively, serve as the corresponding river bank length. The River heads at all levels are responsible for the management and protection of the corresponding rivers and lakes, including water resources protection, water coastline management, water pollution prevention and control, water environment control, water ecological restoration, river bank law enforcement supervision and so on, and supervise the relevant departments and the county level river head work, strengthen assessment and stimulate encouragement.