In 13th Five-Year, Ji'nan will invest about 100000000000 in building a three-dimensional transportation system.
from urban viaduct to urban road network construction, Ji'nan is cutting into traffic congestion with rapid road network construction. It is understood that in 13th Five-Year, Ji'nan will invest about 100000000000 yuan, respectively, to build a number of projects, such as express road, rail transport and ten major passenger terminals, to build a comprehensive three-dimensional transportation system.
according to the Shandong radio and TV news center "Shandong news broadcast", these two days, the eastern Tiger Mountain Tunnel in eastern Ji'nan began to be fully constructed. As the key node of the South extension of the expressway on the Second Ring Road East of Ji'nan, it designs eight lanes with a width of 16.75 meters and will open the bus lane.
Zhang Tao, a project manager of the Ji'nan high speed connection line in Ji'nan, told reporters that the bus was unable to travel because of the impact of the strange slope, the Second Ring East Road and the south of the second ring road. After the tunnel through the tiger mountain tunnel, the bus has greatly improved the network of bus travel.
according to the plan, the viaduct of the Second Ring East Road and the Second Ring West Road in Ji'nan will extend south. After the completion of 2020, the viaduct of the Second Ring South Road will be connected, and Ji'nan will form a "viaduct". The second ring road has been opened to traffic recently, and the time for residents to enter the city center has been greatly reduced.
Chen Jing, a resident of the Zhonghai international community in Ji'nan City, said: "especially fast, no traffic jam, I came out of the house and went to shun plow road in 6 minutes." It used to take 40 minutes and a half hours to go around a great circle.
from the breakage, the closed network to the open extension, the river viaduct in the Ji'nan city will also extend southward to the south of the city. At the same time, the viaduct of the city will continue to expand to the surrounding area and connect with the high speed around the city through eight nodes.
Li Junqiang, the chief engineer of the Ji'nan Municipal Highway Bureau, said: "after the completion of the construction, the whole change of the original traffic of our city in Ji'nan was changed into a" typeface "of" the "well" shaped structure, which can realize the ten minute drive from the starting point to the high speed of the city. "
it is understood that in 13th Five-Year, Ji'nan will invest about 100000000000 yuan to build a number of projects such as express road, rail transit and ten major passenger terminals to build a comprehensive three-dimensional transportation system.