Ji'nan intends to invest 3 billion 500 million yuan to build a Yellow River tunnel or floating bridge.
yesterday, reporters learned from the relevant aspects that the Ji'nan "yellow" tunnel project, which has been shelved for many years, is about to be restarted. From Ji Lu Road North to 309 National Road, the construction of a 4.5 km long road tunnel and a subway tunnel, which is about 4.5 kilometers long, will be built. The total investment of the project is estimated to be about 3 billion 500 million yuan. After completion, the project will help Ji'nan "North span" development.
according to the pre feasibility study report on the project of the Yellow tunnel (road subway), which is located in Ji'nan Tianqiao District, the project is located in the Ji'nan Tianqiao District. The line length is about 4.5 kilometers, including two parts of the road tunnel and subway tunnel, the 309 National Highway in the north, the planned waters of Longhu, the the Yellow River and the ring highway. The Second Ring North Road is connected to the south end. The total investment of the project is about 3 billion 500 million yuan.
the Yellow River has always been a "sky cutting" which restricts the traffic of Ji'nan and North, and it is the key to the development of the "North span" of Ji'nan, but the construction process of the "yellow" tunnel project in Ji'nan is a twists and so. As early as 2005, Ji'nan formally put forward the plan for the construction of the Yellow River tunnel. In 2009, Ji'nan established the the Yellow River tunnel construction management company of Shandong, and the tunnel construction entered a substantive stage of operation. In 2010, the feasibility study report of the Yellow River tunnel project was completed. But after that, Ji'nan's "yellow crossing" tunnel was shelved due to repeated changes in construction subjects. Until May this year, Ji'nan magpie mountain area control detailed planning, the Yellow River tunnel project of Ji Lu Road is in the list, finally broke the "the Yellow River tunnel project will be canceled" rumors, let Ji'nan people re see the "wear yellow" good prospects.
it is understood that the the Yellow River tunnel project is the main road of the city. The tunnel adopts double line and double hole scheme. The main line is 4 lanes of double lines. The main and middle and small types of cars can pass, the traffic speed is 60 kilometers per hour and the crossing tunnel only needs more than 4 minutes. The pre feasibility study has added a subway tunnel on the basis of the road tunnel, that is to say, the construction will be carried out synchronously with the Ji'nan Rail Transit plan.