Shandong Ji'nan flower shop pharmacies and other 60 categories of projects exempt from EIA approval
source: Volkswagen
in future, small drugstores, bookstores, flower shops, and other projects in Ji'nan, Shandong will no longer carry on the ring Environmental impact assessment examination and approval. Ji'nan environmental protection bureau is clear that Ji'nan will exempt the six categories and 60 projects from the EIA approval.
mass network reporter learned today from the Environmental Protection Bureau of Ji'nan, in order to better serve the people, promote related construction projects to the ground as early as possible, and to examine and approve the environmental impact assessment of the 60 categories of water conservancy, agricultural and forestry, husbandry and fishery, road traffic, urban infrastructure, social cause and service, and other 6 major industries. Formalities.
the construction projects closely related to the public are closely related to the public: the pedestrian overpass, the human underground passage, the house decoration, the earthquake resistant reinforcement, the house maintenance, the lamp box advertisement, the renovation of the school buildings, the maintenance and renovation of the sports field; the microenterprise scope drugstore, bookstore, flower shop, and clothing store The storefront of the grocery store and Xerox typed shop is set up with clean energy and no fumes (including bun, wonton, noodle shop), porridge shop and cold and hot drink store. There are concentrated flue, no strong noise equipment, sewage can be connected to the municipal sewage pipe network, and the simple lodging Tour without disturbing people Museums, hostels, and bakery pastries and teahouses without kitchen heads; no maintenance, sprayed Automobile beauty and decoration services that do not involve environmental sensitive areas; a gymnasium, foot bath, massage, massage, beauty salon, table swimming, net bar and computer leisure room with an area of 1000 square meters (no) operating area.
the relevant person in charge of the Ji'nan Environmental Protection Bureau, the above construction project exemption review approval procedures, not only reduce the burden of the enterprise, but also greatly save the enterprise landing, start, investment time and energy, but also promote the development of small enterprises in Ji'nan, can put more energy on those heavy. Pollution and high energy consumption project control to improve entry entry control efficiency. From the point of view of the EIA approval, we should reduce the links and speed up the efficiency.
at the same time, the person in charge reminded that, although these projects can be exempt from the review and approval procedures, the construction and operation process still needs to comply with the environmental protection laws and regulations and standards, and consciously accept the daily supervision and management of the environmental protection department.