Ji'nan the Yellow River bridge from the day after tomorrow, toll collection is still charged by vehicle type.
Ji'nan March 29th news from Shandong high speed shares learned that, on April 1st, 8 a.m., Ji'nan the Yellow River bridge will officially start a heavy charge. According to the regulations, freight cars with a load of twice or more than 55 tons of gross weight will be prohibited from passing through the bridge, while the passenger cars will not be affected. The new regulations will cause a "fatal blow" to severely overloaded vehicles.
to ensure the safety of large bridges in our province, to curb overloading and exceeding the limit of transport, in August 2009, the Shandong provincial transportation department below, Ji'nan, Pingyin, Lijin, Dongming and Binzhou the Yellow River bridge, the five bridge was listed in the first batch of toll list. Due to the closed maintenance of the main bridge, the Pingyin the Yellow River bridge was formally charged in September 4th of the year, and the heavy repair of the Ji'nan the Yellow River bridge was completed after the completion of the overhaul, which will be formally charged at 8 a.m. on April 1st.
according to the documents of the provincial transportation department, after the implementation of the heavy charge, vehicles with a total quality of more than 55 tons (not 55 tons), or more than 100% of the total vehicle quality limit, are strictly forbidden to pass through the bridge, and are strongly advised to return or unload the rear. According to the standards stipulated in document [2006] No. 43 of Lu, the toll is charged for the vehicle, and the fee of 10 yuan per time for the less than 7 passenger cars and the charge of 15 yuan for each bus.
reporter learned that, according to the Ji'nan Public Security Bureau and the Ji'nan Municipal Transportation Bureau issued in September last year's "Ji'nan the Yellow River bridge Limited traffic announcement" requirements, the implementation of the heavy toll of the bridge is still unchanged, for vehicles with a height of more than 3 meters in advance to bypass the other the Yellow River bridge or The surrounding freeway.
>
interpretation: how to charge the weight of the heavy toll collection for the large bridge in my province,
is based on the "notice on the policy of the levy on the toll collection of the clear toll road vehicles" (2006]43 No.). The document will be fatal to heavy overloaded vehicles.
for heavy overloaded vehicles, large overheads will be charged. The Overlimited part is still charged in accordance with the standard in accordance with the following standards: vehicles exceeding the limit of less than 30%, the excess weight part is linearly increasing by 1 to 3 times the basic rate; the excess limit is 30% to 100% of the vehicle, and the excess weight part is linearly increasing by 3 to 6 times the basic rate. Vehicles exceeding the limit of > 100% will be prohibited from passing through the bridge.
take the three axle car for example, the total quality of the car is limited to 27 tons. If the total weight of the car is overloaded with 30%, that is, 35.1 tons, the amount of the car will be charged from the basic toll plus the overweight toll, with a total amount of 65 yuan. In the past, the tolls only cost 30 yuan, and the toll after toll is two times more than before. The new charging policy has increased the punishment for overloaded vehicles. This will play a protective role for the overburden Ji'nan the Yellow River bridge.