Construction of 4 parking lots in Ji'nan City Central District
reporter Wang Yingjun Tian Shan
Miss Li, who works for an insurance company in the Jinlong mansion to grab a parking space, almost arrives at half past six every morning - this is a case of some downtown area. It is not unusual for the office workers. What's more, because the location of the parking space occupied by the first day is very good, some private car owners prefer to take a taxi home, and then take a taxi to work on the second day.
"Ji'nan in February this year introduced the provisional regulations to encourage the construction of public parking lots, with preferential policies to encourage social funds to invest in public parking. As early as last year, the City Central District has made a first step, and has built three dimensional parking lots in the 4 most prosperous areas, including Jinlong building and Grand View Garden. In February 27th, Yang Xianjun, director of the Ji'nan Municipal People's Congress and director of the Municipal Central Committee of construction, disclosed this information to reporters. He said that in order to speed up the construction of 4 parking lots, he has submitted proposals to the two sessions, calling for approval of the green channel. The field survey
Ma On Shan Road, the parking near the 81 overpass is really hard
27 days. The reporter saw in Ma On Shan Road near hero mountain. Although this day is not the weekend, the motor vehicles on both sides of the road are still a long dragon. The convoy of Lunan has been discharged for more than 200 meters, and the sidewalks and auxiliary roads on the north side of the road are also full of vehicles. On the opposite side of the antique city, Zhao told reporters that the parking space on the south side of the road was approved by the government departments concerned, about 40-50; and the north side of the road was not allowed to stop, and the cars stopped on the north side were all disorderly and disorderly. Reporters saw a lot of tickets on the north side of the motor vehicle glass.
"today is not Saturday and Sunday, so it's not a block." By Saturday, you will have a look. The cars coming and going north and South are intertwined with the traffic on the roadside ready to start, and they are often blocked up. " Lao Zhao told reporters.
the reporter observed for a period of time that the cars parked near the Ma On Shan Road, mostly private cars on both sides of the road, and the vehicles that came to heroic mountain to play, to the antique city and the new world mall, were also concentrated, making the road that was not spacious. "There's an underground car park nearby, but it's not enough for the weekend." Lao Zhao said.
the parking lot described by Lao Zhao is the underground parking lot built by the civil air defense mall on the west side of the new world mall. The parking lot told reporters that there were 100 parking spaces in the parking lot, and there were about 400 cars parked every day at the weekend, but it was still often encountered by the owner of the parking lot. "A lot of car owners stopped at the weekend, so they had to circle around the neighborhood. They often went around two laps without finding a parking place." The staff said.
there is also a parking problem in front of the Bayi store of Ginza mall in the south of Bayi overpass. On the afternoon of 27 August, nearly ten vehicles were parked on the road near Bayi shop. "The road in front of the door can't stop." The manager at the nearby car office told the reporter.
reporter saw that there is a parking lot on the south side of the Ginza, but the area is small, it can only stop about 20 cars, obviously can not meet the nearby huge passenger flow. In the west side of the parking lot, the parking lot of Bayi shop in Ginza mall has just been put into operation, and there are more than 100 parking spaces. However, according to the staff of the parking lot, many owners are very troublesome and do not want to park in the underground parking lot. They prefer to park their vehicles illegally on the roadside. "There are many shopping malls near this, many hotels, more cars need to be parked, one to night or weekend people are very disorderly, sometimes it takes 20 minutes to pour out the parking space." A parking lot manager said. "
project planning
stereoscopic parking lot", the highest 16 tier
"the use of social capital investment to build large three-dimensional public parking, this is the first time in Ji'nan." Yang Xianjun told reporters that the Central District of Ji'nan is located in the center of the city. It is an inch of gold, parking and parking lots for a long time, but the public parking lot is built by the government, and the source of funds is a big problem. In the middle of last year, the Central City Construction Commission approved the Municipal Construction Commission, and began to guide social capital investment in the construction of the parking lot.
in the station of the people's Congress, Yang Xianjun specially sent a thick volume of three-dimensional parking planning to the hotel. He pointed to the effect diagram: "this is the future of the new world jewellery antique city parking lot. In accordance with this scheme, 3 floors will be added to the top of the new world mall as a parking lot." There are about 1000 new parking spaces in the new world mall after renovation.
it is reported that the new world parking lot is invested by Ji'nan flangs Trade Co., Ltd., this project has been butted with the planning, land, environmental assessment and other departments, and the fire department is also in progress.
in the back yard of 15 hero mountain road, Ginza Business City Bayi store, Shandong Hualian Commercial Building Limited by Share Ltd plans to invest in building a three-dimensional intelligent parking garage, building 3 floors underground and 13 floors on the ground, which can add more than 1000 parking berths.
in the backyard of Dongtu building at the four latitude and two intersection, Shandong Oriental book company plans to invest in the construction of a three-dimensional parking garage, including two floors and three floors on the ground, which can add more than 250 parking spaces.
in addition, the construction of the three dimensional garage of Jinlong Street Jinyuan street is also in the process of brewing.
represents
faster approval, early completion and early use of
"these 4 public parking lot construction projects are in the downtown area of the downtown area, but also the 4 traffic bottlenecks in the middle area of the city. If these areas are no longer occupied, the traffic congestion in the central and even the city will be improved. The situation will play a positive role. " Yang Xianjun said that with the enthusiasm of the enterprise and the guarantee of social funds, he now considers most of the enthusiasm to protect the investment units. "In accordance with the normal procedures, the fixed assets investment projects need projects, land use, planning and approval, environmental assessment, traffic assessment, fire safety and so on." Approval of the door, the whole process down, not a few months can not be approved.
Yang Xianjun is worried that the construction of public parking is a new thing. In the operation of specific procedures, the relevant approval departments lack corresponding supporting policies and implementation rules, which may affect the efficiency of examination and approval. He submitted to the two meetings "suggestions on accelerating the formulation of relevant policies to encourage the construction of public parking lot", and hoped that the relevant departments should shorten the examination and approval time, optimize the examination and approval process, simplify the examination and approval procedures, open a smooth and fast green examination and approval channel, so as to make the public parking construction projects start at an early start, early completion and early use. It is urgent to ease the urgent problem of parking. "We hope that the government departments will give priority to the construction of public parking lots as far as possible, so as to avoid issuing final approval time limits."
profit mode
social investment, can we recover the cost?
large three-dimensional public parking lot, construction costs are often tens of millions of yuan or even hundreds of millions of yuan, only by parking fee income, the cost of recovery is obviously difficult and far away.
in February 1st, Ji'nan issued temporary provisions to encourage the construction of public parking lots, so that social capital investment in car park projects began to "break the ice". In accordance with this method, if the construction of social capital investment is in accordance with the urban planning, the land can be supplied in the way of other commercial use.
has made clear the three large parking lot of the construction unit, the investors are all commercial units, and the most important thing they should pay attention to is the following preferential policy: "the public parking lot built in -2015 in 2012 can be built up to the commercial area according to the ratio of not above the total building area of 30%, but the land should be in the land. The conditions of the transfer shall be made clear. At the same time, new public housing park projects can be set up according to the advertising planning and technical specifications and approved. "We have never thought of making profits by parking alone. However, according to the policy, it is obvious to us that it is very advantageous for us to build a business area in proportion of 30%. "We build a parking lot, the main purpose is to build a good shopping environment, and the antique city and the new world are all under the banner of our company, and some citizens every weekend, some citizens," he said, who is planning to invest 60 million yuan and -7000 million yuan to build a new world parking lot. You can't find a parking place when you drive, and you may not come back later. Now the government has a preferential policy for the construction of the parking lot, and it is not very difficult to do it, so we are determined to change the problem of parking. "
in accordance with the new policy issued by the municipal government, the public parking lot built in -2015 in 2012 will be exempt from the urban construction supporting fee, the construction fee of the pipe network and the easy ground construction fee of the air defense basement. In addition, there are some other corresponding preferential measures.
related news
People's Political Consultative Conference of the Chinese people's Political Consultative Conference (CPPCC) suggested that the parking lot to achieve "ground air" in conjunction with
at the end of 2011, Ji'nan has reached about 1300000 vehicles, and at least 480 thousand parking spaces are missing in Ji'nan. The contradiction between parking supply and demand is becoming increasingly prominent, and the "parking difficulty" has become a member of the Committee. The topic of discussion, everyone has made suggestions and made many suggestions.
stop the car into the air, save the space
"building a three-dimensional parking lot can solve the parking problem on the one hand, on the other hand, can also ease the car park on the roadside, squeeze the lane problem." Li Yuming, a member of the CPPCC National Committee, suggested that we should make full use of the vertical space to build an intelligent three-dimensional parking lot.
, he said, Ji'nan has promulgated the Provisional Regulations on the construction of public parking lots in Ji'nan, which is conducive to the development of three-dimensional parking lots. It is proposed to coordinate the development of different regions and coordinate the interests of developers, property and residents, to introduce detailed planning rules, and to build a three-dimensional parking lot in public parking places such as important commercial centers, hospitals and communities. The three dimensional parking lot is more flexible and saves money and land. According to the introduction, the space utilization rate of the same area of land can be increased by more than 75%.
Chang Jing, a member of the CPPCC National Committee, also said that to solve the problem of parking is difficult to rely solely on flat parking berths. Chang Jing suggested that the parking problem should be solved by combining traditional parking and three-dimensional parking berths. No approval or sale is allowed for buildings with insufficient parking spaces. "We should simplify the examination and approval link of the construction of stereoscopic garage, and put forward suggestions for centralized examination and approval and joint examination and approval."
excavation of the underground parking lot, with the air parking lot in conjunction with the
municipal CPPCC member Wang Shaohua, suggested that the method of excavating the underground parking lot of large buildings to alleviate the problem of parking difficulty.
because of the shortage of parking lot in Ji'nan City, the car can not find the parking space on the side of the road, crowded the slow lane and part of the motorized lane, not only disturb the traffic order, but also cause traffic jam, also bring safety hazard to pedestrians and non motor drivers.
Wang Shaohua suggested that the underground parking lot of some large buildings should be excavated, at the same time, it is combined with the parking lot and the traditional parking lot to increase the public position, let the motor vehicles go back and improve the conditions of the citizens' travel.
opening street parking unit
on the one hand, after everyone goes to work, the parking space in the district is empty, and the utilization rate is not enough. After the building is built, the parking lot will be sold only without rent, which will result in the unavailability of part of the vacant parking spaces. On the other hand, people who can't find parking spaces can only park their cars on the roadside.
the Committee of the Chinese people's Political Consultative Conference (CPPCC) has proposed that the relevant departments should find out the parking lot in the provinces along the street and register the parking lot with open conditions. Formulate relevant regulations, encourage the unit to open the parking lot along the street, and pay the parking fee according to the price stipulated by the Price Bureau; and even increase the amount of the charge appropriately within the scope of the policy. The government departments give rewards and policy support to the units that open the parking lot to the public.