The construction of Jinqiao bridge can be closed by "ten roads and eight bridges".
source: Ji'nan times
, the Construction Command Department of the Ji'nan Xiaoqing River comprehensive control project announced that the construction of the bridge will be closed in September 23rd. Today, the reporter learned that, considering the citizens during the Mid Autumn Festival, the construction party put the original closed construction time back one day, that is, the closed construction was officially broken in September 24th. The traffic volume of the 11 roads will be over saturated, and the motor vehicles can bypass the "ten roads and eight bridges" nearby. Today, the temporary bridge built on the western side of the Ji Qiao bridge for about 30 meters or so for non motorized vehicles and pedestrians has been laid on asphalt. 11 road traffic volume is easy to reach saturation
this morning, the reporter came to Xiaoqing River to see the bridge, see the bridge is not closed, vehicles can pass normally. The construction staff told reporters that the two sides of the bridge will be closed tomorrow, and the motor vehicle can no longer run from the bridge. "From tomorrow, I will only be able to bypass the Xiaoqing River North Road." Mr. Zhang, the driver of the freight car in the garment city, told reporters that he was driving the goods to the city at ordinary times.
traffic police department analysis, after the construction of the bridge, it will make the traffic of 11 roads easily supersaturated: mainly including the road, the North Road, the road, the South Road of the standard mountain, the North Road of Qinghe, the normal road, the no shadow Mountain North Road, the shadow Shandong Road, the North Garden Road (no Yingshan Middle Road), the sogh mountain road, the riverside North Road.
in addition, the construction may cause traffic congestion at 3 adjacent junctions: North Garden Street and Jishui road junction, normal road and Shandong Road intersection, normal road and shadowless mountain road intersection.
"ten road eight bridge" can provide a reasonable bypass route for motorists crossing the bridge during the construction of
Luqiao. Among them, the drivers across the Xiaoqing River can bypass the advance bridge, the Lishan North Road Bridge, the yhuang Luqiao, the Phoenix Mountain Road Bridge, the Linjia bridge, the Second Ring West Road Bridge, the North Road Bridge without Yingshan mountain and the Shui Tun Luqiao. Of which water Tuen Luqiao is planned to be opened in October.
people of the traffic police department, because of the Linjia bridge, the Riverside South Road, the riverside north road, the North Road of the standard mountain, the north section of the standard Mountain Road (the Riverside South Road to the North Road of the standard mountain), the one-way circulation management mode is carried out in Luqiao: the North Road of the standard Mountain North Road, the north section of the standard Mountain Road (the south side of the riverside road to the standard) Shanbei Road, from the south to the north, one-way traffic, the Riverside South Road (Linjia bridge - Ji Jie road bridge section) from the east to the West one-way traffic from the north to the South one-way road from north to south, forming a small cycle. Linjia bridge is one way traffic from north to south, and Binhe South Road (Linjia bridge Fenghuang road and bridge) carries out one-way traffic from west to East, forming a small cycle.
Traffic Police specially remind drivers that the above one-way road vehicles are prohibited from parking on all sides. The traffic police will set up a detour road map at the intersection of the south head of Jinqiao Road and the north of the Biao Shan Road, the intersection of the north head and the Qinghe North Road, to remind the past drivers. During the construction of
during the construction of Luqiao, 10 roads, such as Qinghe North Road, Riverside South Road (the Second Ring East Road - Ji Luqiao), Beiyuan street, the Second Ring Road, the Second Ring East Road, the Lishan North Road, the Beihuan Mountain North Road, the second Ring West Road, the Shun River viaduct Road, Huanggang road and so on, can be used to bypass these roads.
the new built pedestrian bridge on the west side of the bridge on the west side of the bridge was seen this morning, 30 meters on the west side of the bridge, where a pedestrian bridge was built, and the builders were laying asphalt, and the asphalt could be laid this evening.
according to the introduction, the construction department specializes in building a pedestrian bridge at 30 meters on the west side of the Xiaoqing River Francis bridge. Non motorized vehicles and pedestrians pass through the auxiliary road on the west side of the Ji Road, and enter the west side of Ji Ji Road through the North Gate Road and temporary bridge of the zoo. The
traffic police department reminds the public that during the closed construction of the bridge, the citizens choose the right bypass route according to the road condition, and try to travel by public transportation such as buses.