There are 6 stations on the whole line of the city.
recently, the Ji'nan government network has publicized the public participation information in the social stability risk analysis of the new Ji'nan Laiwu intercity railway project. The purpose is to investigate and analyze the risk of social stability and to open the public opinion. The advisory unit will prepare the report on the basis of fully absorbing the opinions of all parties, and provide the basis for the scientific decision of the next project. The
the Ji'nan Laiwu intercity railway is located in the middle of Shandong Province, from the east of Ji'nan to the East. Yyitai Road, both Jiaoji railway, Century Avenue, and after the ten East Road set up the port Ditch Station, at the same time reserving the planning conditions for Ji'nan to Tai'an railway; after the line exit Ditch Station on the east side of the town of Hong Kong to the east side of the eastern bypass city high-speed, Chai high speed (Jing Hu high-speed) to the East, and along the Chai high speed parallel to Zhangqiu set Zhangqiu south station; out of the station after the station The line turns south, and goes up to Zhai Lai high speed into the snow field station in Laiwu Xue Ye Town. After the outbound station is located near the Daye reservoir, the Laiwu station is set up in Zhangjia Town, Laiwu, and the rear line is in turn across the Chai Lai high speed, the wa day railway, the Beijing Shanghai high speed, and the terminal station of the steel city line of the Laiwu city.
New Ji'nan to Laiwu intercity railway project line building length 115.831km, bridge 55 48.127km, tunnel 25 44.570km, bridge and tunnel length 92.697km, bridge and tunnel proportion 80.03%. There are 6 stations in the whole line, namely Ji'nan East passenger station, Ganggou station, Zhangqiu south station, snow field station, Laiwu station, and steel city east station. The line level is dedicated passenger line, and the design speed is 250 km / h.
the impact and evaluation of social stability in the construction and operation stages of the project will be issued to the public in the form of public notice and questionnaire, mainly to seek the construction procedure, policy planning, plan, technical and economic, land expropriation and compensation, travel influence and ecological environment effect of the new Ji'nan to Laiwu intercity railway project. Opinions and suggestions on social stability risks such as economic and social impact.
the public can reflect the opinions and suggestions on the social stability risk related work of the project through mail, letter, telephone and so on.