Heavy weight! Ji'nan subway R2 line selection and laying mode adjustment. Do you look at your house?
http://sd.sdnews.com.cn/jinan/201611/t20161112_2159973.htm
Shandong commercial newspaper reporter Li Yu
according to the relevant provisions of the Interim Measures for public participation in environmental impact assessment. Recently, Ji'nan city has once again announced the urban rail transit construction plan (2015-2019 years) to adjust the environmental impact information, before 2021 Construction of R1 line, R2 phase I project and R3 line phase I project will have a total scale of 84.362km. After the research and overall design of the R2 line project, it is found that there are many problems in the original plan line project. It is intended to make a comprehensive adjustment to the line position selection and laying mode of the first phase of the R2 line.
(fuzzy line direction)
R1 line project is located in the western new city of Ji'nan city. It is a main line running through the north and south of the western new town in the Ji'nan rail transit network. Through Changqing, middle city and Huaiyin District, the key areas such as innovation Valley, Garden Expo Garden, University City, Yufu river green ecological area, La Shan River area and Ji'nan west station area are connected along the line. The contradiction between the traffic supply and demand of North and South in the west of Ji'nan city is solved, and the new urban area between the West and the main city is effectively strengthened. Contact.
line length 26.1km (the overhead line length is about 16.2 km, the transition section is about 0.2 km, the ground line is about 9.7 km), and a total of 11 stations (4 underground stations and 7 viaducts) are set up. The first phase of the
R2 line started at Wangfu Zhuang station, mainly along Liu Chang Shan Road, Yongjun Road, Yantai Road, Zhang Zhuanglu, dike road, Beiyuan Avenue, seven Li Fort Road, Zhu Shun Road, Huang Tai Road, leap Avenue, and Peng Jia Zhuang station. The
phase I project line has a full length of about 36.4km (lower line 34.6km, elevated line length 1.8km), with 19 stations (18 underground stations, 1 elevated stations), and 10 transfer stations (2 seats for three line transfer stations).
R3 line I project starts at Longdong Zhuang station in the south end, along Longding Avenue, Austrian West Road, industrial North Road, planning Ji'nan new east station north-south axis to the middle axis, next to the Jinan Qingdao expressway, and stop at the TanTou Railway Station.
the first phase of the project is about 21.592km, with 13 stations and 7 transfer stations.
the adjustment of Ji'nan urban rail transit construction plan (2015-2019 years) conforms to the national environmental protection requirements and energy policy, and is basically coordinated with the overall planning of Ji'nan City, the overall planning of land use, the environmental protection, the protection of the historic and cultural cities and so on. If there is any view and attitude to this plan, the public may, within 10 days, submit to the construction unit or the environmental impact reporting unit through letters, facsimile, telephone and e-mail.