Re: Ji'nan rail transit R3 line 10 site closed construction R2 line will start within the year
Ji'nan rail transit R3 line to map
Ji'nan rail transit R3 line to map decomposition map 1 (Longdong Zhuang Station)
R3 line of Ji'nan rail transit to map decomposition diagram 2 (Dragon Ao station)
prediction of R1 line trial operation at the end of 2019 at the end of R3 line trial run
R3 line project manager Liu Fengzhou Reporter, "we mainly take several measures to bring the original traffic to the body and West Road to the Middle Road, keep the sidewalk and non motorized driveway as far as possible when the traffic is relieved. The other including traffic signs, guidance and so on are done well in advance, and will be completed by the 16 night, and minimize the impact on the traffic. "