Ji'nan rail transit started construction of R1 line at the end of 2015.
daily daily daily
at the provincial infrastructure construction site conference held in Linyi, the next step in our province is to be set up. The construction will focus on six major projects: urban road network improvement, underground pipeline construction, gas and thermal power construction. In terms of rail transit, Ji'nan will have to start construction by the end of 2015, and Qingdao will have to open its first line.
by the end of next year, Qingdao rail transit vehicle
is understood that in the first half of this year, the province completed 57 billion 900 million yuan in urban construction investment, an increase of 8.4% over the same period last year. In the current and future period, the construction of urban infrastructure in the province will be the main line to promote the new urbanization. In the improvement of urban road network, the road construction is the most important part of the city construction. Speed up the construction of rail transit. By the end of 2015, Qingdao will realize the opening of the first line, and Ji'nan will start construction of Zibo, Yantai, Weifang, Linyi and other cities to do the early work, and strive to complete the city's urban rail transit over 200 kilometers by the end of 2020.
at present, parking difficulty has become a big problem. Our province will increase the intensity of parking lot construction. By the end of 2015, special planning for parking facilities should be formulated in all districts and municipalities, and the county (city) should consider it necessary to compile according to needs, and it will be completed in 2016. Improve the parking fee standard in urban central area, and support social capital to participate in the construction of public parking lots.
strict control mining zipper road
in addition to the construction on the ground, our province will further strengthen the construction of underground facilities. The comprehensive planning of urban underground pipelines should be prepared in various places. According to the principles of the first underground and back ground, the time series of underground pipelines and roads should be arranged reasonably, and the laying of the underground pipelines should be laid in place at once. We should establish a total control system for road excavation and strictly control road excavation so as to prevent the phenomenon of zipper road. At the same time, we should vigorously promote the construction of integrated pipe corridors, and establish an integrated management information system for underground pipelines before the end of 2015, so as to achieve instant information exchange, joint construction and sharing, and dynamic updating. In terms of gas and thermal construction projects, by the end of 2015 and the end of 2020, the city's pipeline gas penetration rate reached 70% and 80% respectively.
to promote public and private cooperation mode in our province, we should further liberalize the investment, construction and operation market of urban infrastructure, actively broaden the direct financing channels of urban infrastructure construction, vigorously support the issuance and construction of bonds in urban infrastructure, and actively promote the mode of public and private cooperation.
water and hot gas upstream and downstream price linkage
coal price reduction, heating fee will not be adjusted accordingly? Electricity price will be properly lowered? Price is the lever of public service adjustment, set up a flexible price, let the public accept, let the enterprise run. The head of the provincial housing and urban and rural construction department said.
our province will improve the price formation, adjustment and compensation mechanism of public utilities services such as water supply and drainage, heating, gas and sewage disposal, and research and establish the linkage mechanism between the upstream and downstream prices of municipal public products. We should improve the price system of water consumption, electricity consumption and gas consumption for urban residents, and promote resource conservation.
metro traffic R1 line municipal design began to bid for
Ji'nan rail transit R1 line project Municipal Design Bidding began, the 19 day, the Ji'nan public resources trading network issued a tender announcement. The contents and scope of tendering include scheme design and construction drawing design. The construction site of the bidding project is from Ji'nan to Changqing. The whole line is divided into two tenders, one of which includes vehicle depot, and the municipal interface of the university town main transformer. The two Tenders include the big Yang Zhuang main transformer and the control center municipal interface. This is another tender after the tendering of Ji'nan rail transit R1 line (civil engineering supervision section of the test section) on the 15 th of this month. From the progress of bidding, the construction of R1 line is speeding up.