The basic price of housing in Ji'nan is 10.68 yuan per square meter, which can be applied for free temperature measurement.
source: daily daily Author: Ding Jie
recently, Ji'nan Price Bureau issued a notice, stipulated the 2012-2013 year heating season Ji'nan city central heating metering price, this heating season, Ji'nan city residential basic heat price is 10 per square meter. .68 yuan, the same as last year.
daily daily news (reporter Ding Jie) in October 14th (reporter Ding Jie) recently, the Ji'nan Municipal Price Bureau issued a notice, stipulating the 2012-2013 year heating season Ji'nan city central heating metering price, this heating season, Ji'nan city residential basic heat price of 10.68 yuan per square meter, and the same as last year.
the heating price of the heating season is subject to the two part heating price, that is, the basic heat price and the measured heat price. The basic heat price is charged according to the housing area, where the residential area is built according to the construction area, and the non residential building is charged by the meter reading device according to the construction area and the measured heat price. The formula is: using heat cost = basic heat fee to measure heat cost. Basic heat fee = basic heat price (yuan / square meter) * billing area (square meter), metering heat fee = heat metering price (yuan / kWh) * heat consumption (KWH).
the basic heat price of residential housing is 10.68 yuan per square meter, and the measured heat price is 0.17 yuan per kilowatt hour. The basic heat price of non residential housing is 19.90 yuan per square meter, and the measured heat price is 0.21 yuan per kilowatt hour.
this year's heating metering price is still paid in full first. After the heating is finished, the method of "more or less less" will be implemented.
this notice requires that the heating enterprise should guarantee the heat supply quality, meet the heat demand of the residents, ensure that the user can reach the standard temperature stipulated in Ji'nan after the control of the room temperature, and the user can complain and deal with the temperature and refund regulations due to the cause of the heating unit.
according to "Ji'nan city central heating management regulations", Ji'nan urban heating period from November 15th to the next year March 15th, according to climate change, the Ji'nan Municipal People's government should decide to advance or extend the heating time, and to the social announcement. The temperature of the hot users in the heating period should not be less than 16.
reporter from Ji'nan thermal power and Ji'nan heat two heating enterprises to understand that, if the heating period, if the user thinks that the home did not reach the prescribed temperature, can call the Ji'nan thermoelectricity and Ji'nan thermal power customer service phone to apply for free temperature measurement, staff will be based on the results of temperature measurement, analysis of the residents' home is not hot.
Ji'nan thermal power customer service personnel introduction, if the user is not satisfied with the temperature of Ji'nan thermoelectric, you can contact the third party temperature measurement.
Service reminding to
do not refit the heating equipment in private
heating system in the room is strictly designed and installed, how many areas the installation of the heater has a certain specification. Self refitting heating equipment will destroy the overall structure of the heating system, and may because the heating pipe is not tight running water leakage and other phenomena, serious may cause the heating equipment to be damaged, affect the heating effect.
do not cover the heating facilities
many families to carefully "wrap" the radiator in order to be beautiful, this method is not appropriate, coupled with the "packaging" heat dissipation facilities affect the heat conduction, convection and radiation, it will certainly affect the heating effect. Covering the heating facilities, the indoor temperature is reduced by 3 degrees centigrade, and it is not easy to detect faults in time.
check valve
heating season before long business trip. If people need a long time to travel, home heating is not taken care of, it is necessary to check the safety of indoor heating facilities carefully before business trip. The main parts of inspection are: water intake valve and exhaust valve of radiator.