Ji'nan 22 thousand and 200 residents relocated in 2010 and accelerated resettlement housing construction
with the increasing speed of the construction of the spring city, the shanty towns are gradually disappearing in Ji'nan. This is the scene before the demolition of shanty towns near the river's viaduct. (information)
March 24th News 24, the reporter learned from the Ji'nan city and rural construction work conference, this year, Ji'nan will plan to dismantle 6 million 200 thousand square meters of all kinds of houses and appendages, relocate 22 thousand and 200 households, speed up the construction of resettlement housing, and create a batch of relocation and resettlement housing.
it is understood that the city of Ji'nan will standardize the management of demolition, strengthen the supervision of the demolition units and the demolition evaluation institutions, establish and improve the working mechanism of the ruling, strengthen the resolution of the demolition disputes, speed up the construction progress of the resettlement housing, create the conditions to reserve a batch of relocation and resettlement houses, and try to shorten the transition time of the return, and guarantee the transition time as far as possible. The demolition work was carried out smoothly. At the same time, Ji'nan should strengthen the site management of dust removal, do well in dust control and enclosure management, and strive to achieve green demolition and safe demolition. Wang Liang, standing committee member and deputy mayor of Ji'nan Municipal Committee, said that the demolition, sunshine removal and harmonious demolition should be accelerated according to law.
reporter learned that in 2010, Ji'nan planned to dismantle 6 million 200 thousand square meters of all kinds of houses and appendages and relocate 22 thousand and 200 households, of which 12 thousand urban residents were planned to be moved and 1 million 100 thousand square meters of housing and appendages were removed.
at the same time, Ji'nan will accelerate the Legislative Research on the construction and management of barrier free facilities, and further promote the revision of the management measures for the collection and use of supporting fees for urban infrastructure in Ji'nan, and strive to be introduced as soon as possible. Ji'nan will also strengthen coordination with Jinan, Dezhou, Qihe and other related aspects to speed up the remainder of the remainder of the new airport and the new airport railway line, to ensure the smooth progress of the new airport construction and the land reception at the present airport.
"sandwich layer"
this year we plan to push the public rental housing
the social "sandwich level" can not afford to buy a house. What should we do? 24 days from the Ji'nan city and rural construction work conference uploaded good news, the provincial city this year to study the launch of public rental housing, try to solve the "sandwich layer" can not afford the house.
it is understood that, with the continuous improvement of the housing security system, many low-income families have solved the housing problem through affordable housing, but there are still a number of citizens who can not afford a commodity house for a short time, but they can not rent the government's low rent housing. This part of the housing problem is becoming more and more difficult. A survey shows that even some college students who have been involved in the work for many years have not saved enough to pay for the first payment. Many experts suggest that the government contribute to the construction of public rental housing
"this year we must study the problem of public rental housing." The responsible person said that at present, many provinces began to pilot, and the relevant departments in Ji'nan are also studying and exploring related issues. He revealed that public rental housing is not owned by the individual, but is owned by the government or public institutions, and rents to new employment workers at a price lower than the market price or the price the tenant can afford, including some new college graduates, and some groups who have migrated from the field to the city.
"building energy saving"
100% using new wall materials
24 days, the reporter learned from the Ji'nan urban and rural construction work conference that this year, Ji'nan will push forward the demonstration work of renewable energy building application, the application rate of new wall materials will reach 100%, the implementation of residential building energy conservation reform is 800 thousand square M, the implementation of solar water heating system and building integration of 2 million 200 thousand square meters.
it is understood that Ji'nan will grasp the energy conservation and resource utilization of the building, and make a special plan for the application of renewable energy buildings in the city, and vigorously promote the demonstration of the application of renewable energy buildings. "Solar energy and building integration are very good. We must make good use of solar energy." In his speech, Mr. Tian Zhuang, director of the Construction Commission of the Ji'nan Municipal Construction Commission, made a special reference to the integration of low carbon, green, energy saving and environmental protection into the architectural concept, and to promote the development and promotion of new technologies, new technologies, new materials and new equipment.
at the same time, Ji'nan will also deepen the energy conservation transformation of existing residential buildings, strive to complete the task of building energy conservation reform of 2 million 400 thousand square meters, promote energy saving supervision and reform of office buildings and large public buildings, and do a good job of energy audit and energy monitoring system construction for large public buildings, and make real thin wall material leather. New and building energy conservation work to speed up the comprehensive utilization of construction waste.
it is understood that in 2010, in the aspects of wall material innovation and building energy conservation, the application rate of new wall materials in Ji'nan will reach 100%, 800 thousand square meters of energy-saving renovation of existing residential buildings are implemented, and the integration of solar hot water system and building is 2 million 200 thousand square meters.
the completion of the transformation of 15 thousand old houses
this year, Ji'nan plans to complete the construction of 8 towns, complete 70 thousand rural housing construction and 15 thousand old critical housing reconstruction tasks, cultivate the characteristic village and create Star town.
in accordance with the "main points of urban and rural construction work of the city in 2010" issued by the Construction Commission of Ji'nan City, Ji'nan will also vigorously promote rural housing construction, take rural housing construction and new community construction as the grasp, actively and steadily promote village transformation and relocation of villages, accelerate the transformation of villages in urban cities, and ensure the completion of 70 thousand rural residential housing. Housing construction and the reconstruction of 15 thousand old houses.
at the same time, Ji'nan will also carry out village renovation, focusing on rural environmental regulation, sewage treatment, national characteristic village construction, culture characteristic village cultivation, increasing support, in-depth guidance, tracking supervision, to realize the transformation of village regulation from point to surface.
it is understood that in the construction of villages and towns, Ji'nan plans to complete the construction tasks of the fourth batches of 8 towns in the "urban construction action", and complete the construction of 70 thousand rural housing and the transformation of 15 thousand old houses. "
construction site civilization"
sandy soil must cover all
"100% coverage of site sand soil, 100% hardened site pavement, 100% flush wheels on site vehicle." 24, Ji'nan city and rural construction conference, the director of Ji'nan Construction Commission, Tian Zhuang said that the construction site of the provincial capital must strengthen the construction of civilization, consolidate the construction site management results during the whole transportation, civilized construction, green construction.
at the meeting, the head of the Construction Commission of Ji'nan said that during the whole transportation period, the construction site management of the construction site of the provincial capital has achieved certain achievements, and the civilized construction and the green construction have been carried out in an all-round way. With the construction site entering the construction period in the spring, the Construction Commission of Ji'nan Municipal Construction Commission requires that the provincial capital will continue to strengthen the management of the construction of civilization, strictly control the dust pollution, make efforts to cover the sand and soil of the site 100%, harden the road surface 100%, and develop the vehicle 100% to flush the wheel.
Ji'nan will increase the house of migrant workers and the construction of night school. Civilized construction requires at the same time, establish and improve the responsibility system for the disposal of residual soil in the construction site, supervise the construction units to select the approved residual soil transport vehicles and implement the related standards. Efforts should be made to strengthen the construction of migrant workers' visiting houses and night schools, and promote the use of warning words for humanized safety in production, so as to improve the production and living environment of migrant workers.
meeting first read "bloody lessons"
" construction units must strengthen the special treatment of building construction to prevent collapse, fall and other accidents, strengthen the safety inspection of all aspects of construction, especially the installation of safety protection facilities, and strengthen the inspection and supervision of dangerous security risks such as high support mould, deep foundation pit, underground excavation and so on. At the meeting, the director of Ji'nan Municipal Construction Commission, Tian Zhuang, stressed the problem of safety production many times, and suggested that the staff of the units concerned read carefully the warning records of construction safety accidents.
reporters see, "construction safety accident warning record" summed up the production safety accidents in construction in recent years, the content is very rich, using bloody real cases and scene pictures to knock sore alarm clock, more to the construction, construction, supervision units play a warning role. After many construction and construction units have looked through, they have repeatedly felt "too shocked". Construction must put safety in the first place.
the manuscript of this edition is written by reporter Liu Jingzi Qi Shujun Intern Li Chanjuan, photo reporter Qiu Zhiqiang.