Solar energy developers do not install solar energy in new residential buildings, with a maximum fine of 300 thousand yuan.
Shun Net - Ji'nan daily author: valley green
100m building compulsory solar energy hot water system policy has been implemented in our city for four years. The urban and rural construction commission of urban and Rural Construction Commission has introduced the supervision and management method for the application of solar hot water system for new high-rise buildings (hereinafter referred to as "management method").
after the solar hot water system is strongly installed, the property of the product has changed, from the commodity to the Ministry of construction, the standard requirements and the supervision and management are also certain to be different. In order to ensure the safety, efficiency, beauty and comfort in the process of installation and use, the management measures, while improving the technical requirements of the product, emphasized the integrated design and construction concept. The project that did not meet the requirements of design or design according to the requirements would not issue the examination certificate for the construction drawings.
for the parties to participate in the construction of the solar hot water system, the Management Measures stipulate that the maximum 300 thousand yuan penalty of the relevant construction, design, construction, supervision and other units should be given to the construction, design, construction and supervision units at the same time, and together with the solar energy production enterprises together with the credit evaluation system. A discredited person is lost in a letter and is restricted everywhere.