Ji'nan's official implementation of the heat metering charge is expected to be more or less.
source: Ji'nan Times reporter Chai Yingying
this year Ji'nan formally implemented the thermal measurement, a total of more than 300 million square meters. Since the 15 zero hour, the heat metering of the heating season has officially started this year.
Ji'nan each of the hot enterprises in charge of the responsible person, last year, the Ji'nan thermal metering charges are still "more retreating and less not supplementing" policy, Ji'nan heat and power to the user to refund about 100000 yuan heating fee. However, the hot business people believe that the lack of subsidies is not in line with the laws of the market. Relevant responsible person, the implementation of thermal metering and energy-saving building transformation is an effective way to save resources, but the implementation of heat metering charges, still encountered a lot of difficulties, the home users and at the top, many people do not agree on heat measurement fees, this part of the residents think that the heat is larger, not worth the loss. The implementation of heat metering charge has a high requirement for the hardware and system. The thermal meter must be able to realize the remote transmission and collection of data, and set the meter alarm system. Once the problem is found, it can be found and solved in time.
key words: to cool
new boiler "post" peace road will be warm
reporter from the Ji'nan city heating Department, the new 2 hot water boilers of Ji'nan thermal power plant this year are also about to be "on guard", which is expected to add new 3 million square meters of heating capacity to the eastern city. The hot water from the new boiler of Dongxin thermal power plant will be sent to the peace road, the person in charge said. By then, residents on both sides of the peace road will benefit.
two pipeline network update after the Dongxing apartment "heating up"
15 days, the reporter visited the newly recovered Dongxing residential district. The residential area of Dongxing is originally a heating area of self tube station. The heating area is about 70 thousand square meters, which has been used for 7 years. Previously, because of self management station management is not in place, residential heating problems. Starting from the last heating season, the Ji'nan thermal power took over the self control station and urged the developers to transform the self control station equipment. In order to improve the heating effect of the residential district, this year, Ji'nan heat investment in the residential area of the two network of aging maintenance and renewal, the replacement of 200 meters in charge of the network, this winter residents are no longer cold at home.
the southern whole of the fufu community this winter all hot up
15 days, the reporter in the East District of South fufu District 3 House residents see, home heat has been heated up, the room temperature reached 21. Last year, the Ji'nan thermal power carried out steam reforming to nearby South Fuquan. In January this year, the South District of South Quan Fu District has realized heating. Then the heating preparation for the eastern and western districts of the South Quan Fu District was carried out, and the western district will also be warm in recent days. There are 28 buildings in the eastern and western districts, with a total area of 80 thousand square meters. Residents in the District of South Quan Fu neighborhood have basically used central heating.