The Wangfu pond is dredging now and strive to complete the dredging work within 1 months.
reporter from the District Garden Bureau of the calendar, in order to further improve the image of the Ming Fu City section, the district will begin to clear the silt of the Wangfu pool in 9, and strive to complete the entire silting work within 1 months.
the staff of the Bureau of parks and gardens said that because the Wangfu pool was unable to use machinery in the streets and lanes, all manual operations would be used in the operation of silt transportation. It is reported that this process will absorb the experience of clearing up the silt in 2009. First, several pumps will be used to dry up the water in the pool, and then the bottom of the pool is cleaned with high pressure water gun, and mud pump is removed by mud pump at Qi Feng bridge. To reduce nuisance, the garden Bureau of Lixia District will speed up construction progress and strive to complete all work before mid May. After the completion of the dredging of the Wangfu pond, the silting of the jade belt river will follow.