Ji'nan Daming Lake "north to South Water Diversion" starts next month, and is expected to be completed in August.
to create a water ecological civilization city, the Daming Lake will be reused. The municipal departments plan to make full use of the lake water in Daming Lake, and make the daily abandonment of the water southward to the Lishan Avenue, and then go down the East and West gullies of the square, and create a landscape for the urban river. 8, reporters learned from the city drainage management service center, Daming Lake water diversion project started in May, completed in August. At that time, the water in the East and west sides of the square will be gurgling, and the public can enjoy the scenery. Three level pumping station pressure to conquer 100 meters high difference
reporter learned that Daming Lake water diversion line along Shun Shun Road southbound to Liyang street. Ji'nan land south high North low, the distance can reach more than 100 meters, the construction personnel how to conquer?
the responsible person, from Daming Lake to the south water diversion, the lake water from the underground pipeline, as the delivery of tap water. The water conveyance pipeline is laid at the bottom of the river, and the lake reaches the Liyang street near the East Square and the West ditch. The lake flows downstream from the source of the East and West gullies. The square east ditch and Square West Ditch converge to the West dizi trench, then enter the West River, and finally enter the Xiaoqing River. From Daming Lake to Liyang street, the water pipeline should take about 8 kilometers. The staff said that three pumping stations will be added along the way, and the lake will be hit upstream with pressure.
reporters learned that the Daming Lake has been fully utilized for a long time. The industrial and commercial rivers and production channels are built by Daming Lake, and now they have become the landscape river of the city.
next month starts to start this autumn or the waterscape
relevant person in charge introduces, according to the construction plan, the water diversion project starts construction in May. After the construction is completed, this autumn will be able to enjoy the waterscape of the East and west sides of the Plaza.
there is a public doubt that the Daming Lake will affect the landscape of Daming Lake. Reporters learned that Daming Lake now has about 1 million 250 thousand cubic meters of water storage capacity. After the flow of water near the spring group into Daming Lake, the excess water in Daming Lake can enter the Xiaoqing River through the Donghe River and the West River. Daming Lake every day about 150 thousand cubic meters of water into the Xiaoqing River in vain, it is a great pity to waste. A new dam is planned in the East and west side of the Plaza, which can slow down the upstream rainwater flow and create a river landscape. The director said that after damming the surface of the water, landscaping and beautifying the surrounding area will create a place for leisure for the citizens.