56 million 600 thousand yuan renovation of river channel in Ji'nan
http://www.dzwww.com/shandong/sdnews/201304/t20130409_8212911.htm
mass network reporter Yang Rongchao
reporter today from the Ji'nan calendar area, the area will be invested in 56 million 600 thousand yuan, 3 channels for pollution control.
the area has introduced the scope and standard of river regulation and management, which stipulates that there are 10 meters on both sides of the river, 30 meters from the reservoir area outside the reservoir and the management range of the dam, so as to achieve clean and smooth behavior such as no living garbage and building waste and water barrier. At the same time, the district plan to invest 56 million 600 thousand yuan, to bear the eastern Daxin River (industrial North Road - Industrial South Road), Ding Jia Zhuang gully (ten - Provincial Women's prison) and the middle well flood channel (ten road to the liberation of the East Road) to carry out pollution control. At present, construction bidding has been completed, and construction will be introduced in the near future.