Daming Lake expansion, Garden Expo Garden opening, full navigation of the moat river, free opening of Forest Park and Baihua Park in Ji'nan, continuous spraying of spring water and breaking through 30 Mi Daguan... In the past few years, the urban landscaping construction in Ji'nan has brought a lot of surprises to the public. Will the surprise continue? What are the surprises that will be brought to the public this year? The city's urban landscaping and famous spring conservation conference in March 10th gave us the answer.
when Daming Lake is officially navigable with Xiaoqing River, the preliminary answer was given at yesterday's meeting. If the demolition can be completed in 2011, the Daming Lake Xiaoqing River Navigation Project will be completed by the end of 2012.
according to the introduction, the Daming Lake - Xiaoqing River Navigation Project is an important part of the "one ring, two line and three lakes" navigation route of the spring city's ecological water system. It is the landscape gallery and the green corridor connecting the old city and the Binhe new area. The navigation project is 2.2 kilometers long, each side of the green space is 15-30 meters wide and the construction area is 186 thousand square meters. The construction area is 186 thousand square meters. The river will be excavated, the bridge and the lock, the flood control sluice, the control gate, the pipeline, the lighting, and the greening nodes (the channel and the afforestation bandwidth of 90 meters) are built in accordance with the actual conditions along the line, and the cultural connotation and the city are enriched. City landscape.
the project will be connected to Daming Lake and Xiaoqing River through excavation of Donghe river. At the same time, it will lay the foundation for the long-term construction of the moat - Daming Lake Xiaoqinghe Beihu Huashan Lake sightseeing line. According to the plan, the project mainly carried out planning design and preliminary investigation work in 2011, and carried out construction for qualified projects. If the demolition works can be completed in 2011, the navigation project will be completed by the end of 2012. The project is estimated to be more than 300 million yuan in investment this year.
in addition, the ecological green corridor construction of Xiaoqing River will be implemented this year. Through the building of garden greening, landscape architecture and nodal products, the construction of the 210 thousand square meter landscape project along the North Bank of Linjia bridge to the second ring road bridge is completed, and the construction of 710 thousand square meters of the South North Bank of the two phase of the South North Bank of the Xiaoqing River is started by the Linjia bridge to the Beijing Fuzhou section. The plan is completed in 2011. 420 thousand square meters, the implementation of landscaping, building landscape architecture and node sketch.
five major parks are fully upgraded by
Qianfo Hill will clean up the low grade tourist attractions
last year, Ji'nan Forest Park and Baihua park have been upgraded to let the public be in front of the eyes. This year, five major parks in Ji'nan will be transformed and upgraded, which will bring a pleasant surprise to the public.
this year, Ji'nan will implement the Zhongshan Park expansion and Ji'nan flower park construction. Among them, the Zhongshan Park expansion in 2011 mainly completed the basic research, planning and design work. The construction of Ji'nan flower park is aimed at dismantling about 30 thousand square meters of the surrounding 8 residential buildings, and reconstructing the Ji'nan flower and tree center into an open park with a combination of flower exhibition, flower science and garden landscape, which changes the situation of lack of large park green space along the sides of the ten West Road. In 2011, the basic research was completed. Planning, design and other work, did not involve part of the demolition area construction.
Qianfo Hill scenic area will also be transformed and upgraded this year. In the current scope of the Qianfo Hill scenic area, dismantling the unsightly structures and cultural grade tourist attractions, upgrading the roads, paving, retaining walls and entrance and exit infrastructure, strengthening the effect of ecological landscaping, highlighting the two cultural main lines of Buddha and Shun, and carrying out the corresponding cultural display sites and contents. Integration and transformation will enhance the overall landscape and cultural taste of Qianfo Hill scenic area.
the construction of Ji'nan National Wetland Park will be built this year on the basis of the improvement of the early construction. The construction of landscape greening on both sides of the river, the construction of the square, Garden Road and management room will be put into practice, and the largest national wetland in the north of Jiangbei is built into a combination of ecological protection, popular science education, cultural display, tourism and other functions. The project is estimated to be 600 million yuan for the project this year. In addition, this year, we will also carry out the construction of the La Shan River banding Park in the West passenger station section. Through the stone masonry, plant planting and infrastructure construction, the old Ji'nan pond and the special landscape of fishing and Heliu Iyo are rebuilt. In addition, in the construction of district parks this year, the construction of 16 District parks, such as Hongshan and Lang Maoshan, will be implemented to build and open 3 District parks, such as Emei Mountain Park, Dongsha Park and Tang Ye Sports Park, which have a total area of 328 thousand square meters, providing a good ecological and beautiful environment for the people nearby. Fitness, leisure and entertainment.
the renovation of the Baihua island will be an important part of the characteristic area of the spring city, and it is also a new bright spot for the protection and construction of the city of the city of the city of
according to the plan, the main plan and special design are completed in 2011, and the construction of some basic facilities and the landscape of the Baihua Zhou and the kiosk are completed in 2011.
spring water stop spray pressure still exists
the city garden greening and famous spring protection conference held in March 10th, revealed that although the water level in Ji'nan is higher than that of 2008, 2009 and 2010, there is still a danger of stopping and breaking off the flow, and the pressure of the spring is still severe.
the meeting revealed that since October of last year, the precipitation in Ji'nan was relatively low. From January to February this year, the average rainfall in the city was only 13 millimetres, 30% less than the same period last year. In February, the water level of Baotu Spring dropped to 25 cm, slightly larger than the same period in previous years. Due to the relatively abundant rainfall last year, the level of black tiger spring and spring water in the spring is higher than that in the same period in 2008, 2009 and 2010. However, Ji'nan is currently in a low water period. The recent rainfall and snowfall weather is difficult to fundamentally relieve the drought, and the spring irrigation is about to expand. The pressure of the spring water stopping and breaking out still exists, and the long effect conservation mechanism needs to be improved. At the meeting of
, it is proposed that in order to ensure that the spring water will continue to erupt in the normal year of precipitation, this year, the world natural heritage declaration standard will be compared with the seventy-two spring environment renovation, the landscape of the famous spring is restored, the phenomenon of bathing in the spring water is restored, and the similar spring water bath will be built in the future. Place. Ji'nan will set up a "Shen Yi" institution in good time to promote the process of "application for Heritage". At the same time, Ji'nan will set up a special plan to plan the Spring Festival, seize the opportunity of the "ten Arts Festival" held in Ji'nan in 2013, and plan and prepare the spring festival activities.