The straight drink point in Ji'nan spring rose to 30 this month
Shun Network - Ji'nan times
October 31st The straight water pipe laying on the West Road of the black tiger spring is basically completed. The 5 new drinking water points will be unified. The water table is changed from the original stone to the durable stainless steel material, with one high and one low two outlet, the ground laid antiskid pads, and the surrounding installation of the guardrail to prevent the car from impact damage, the whole direct drinking water expansion will be 1 By the middle of January, the number of direct drinking water will be increased to 30. Reporter Wang Feng