Jinan people in September are expected to turn off the water pipes and drink the spring water.
Shandong commercial newspaper reporter Gao Yulong
with the "Spring City" of the name of the city of Ji'nan has the world's unique spring resources. However, for many years, the Jinan people are faced with the embarrassment of "drinking water from the Yellow River". However, as the first spring water direct drinking project in Ji'nan, Baotu Spring will be completed in September this year after the first view of the project, and the public can drink the spring water at home. After the completion of the pipeline, the pumping station and filter station of Baotu Spring are being built.
project starting point for the Baotu Spring main spring pool
to understand that the starting point for this project is the Baotu Spring main spring pool. According to the plan, one of the pumping stations will be built in the Baotu Spring park. After drawing the spring water from the main spring of Baotu Spring, it will be transported to the prun gate water plant through the Communist Youth League Road, PRI street and Shun he East Street. At the same time, in the vicinity of the water plant, a main filter station is built mainly by ultrafiltration, which is directly transported to the water supply network through the original plymen water plant to provide direct spring drinking for the surrounding citizens. "
" Baotu Spring spring first view and post use project mainly includes three aspects: Baotu Spring pumping station project, water pipeline project, filter station project. " Ji'nan municipal departments related staff, "the Baotu Spring pumping station project scale to reach 20 thousand cubic meters per day, water pipeline for 600 millimeter diameter ductile cast iron pipe, the length of 1500 meters, the scale of the filter station is 20 thousand tons a day."
installation of pumping station equipment or next month to complete
and the reporter was informed that the construction of the water pipeline in the construction of the Baotu Spring spring first and after the renovation of the PRI street and Shun he East Street last year, has been completed. The pumping station project is now under construction and is expected to be completed by next month. At the same time, the construction of the filter station has also been launched. The equipment installation is planned for August, and the overall acceptance can be carried out in September.
"through the construction of these three projects, the quality and quantity of the effluent of Baotu Spring can be guaranteed to the maximum extent." Ji'nan municipal departments related staff, "at the same time, the water quality monitoring and water quality early warning system will be built to reduce the risk of sudden water pollution. And the construction of the filtration station based on the ultrafiltration technology will ensure the safety of water supply. "