Ji'nan spring bath will be built in antique style and free in October.
source: the Qilu Evening News
with the arrival of high temperature weather, the people's expectations of the Ji'nan spring bath are becoming more and more intense. 25, the reporter learned that the Sports Bureau of Lixia District located on the north side of the youth swimming pool is being demolished. After the demolition of the surrounding buildings, the spring bath will start. The plan of the spring bath area has been partly adjusted on the basis of the previous plan, and the bathing place will be built in antique style.
the District Sports Bureau has been vacant
25 morning, the reporter in the north side of the swimming pool in the Youth Sports Bureau saw that the office building has been empty, the builders are dismantling the doors and windows and other basic facilities. Site construction staff told reporters that the surrounding office units have not yet been relocated, so the specific demolition period can not be determined.
Mr. Yuan said, with the arrival of the high temperature weather, we hope that the surrounding buildings will be removed and removed early to help the people enjoy the cool after the spring baths are built. In this regard, the Sports Bureau official said that he was actively coordinating the handling of the lease contract and striving to complete the relocation as soon as possible so as to provide conditions for the construction of the spring bath.
24 hours to the bathhouse inject spring water
reporter from the plan effect map, the spring bath is a rich classical garden style natural hydrophilic paradise, surrounded by the bathhouse, decorated with Rocky Mountains, spring waterfalls, pavilion, greening small items and other landscapes. The southern side of the youth swimming pool will build a rockery with a pavilion. The springs from the black tiger spring group will fall down from the rockery and form a waterfall landscape into the bathing place.
reporters learned that some of the designs were adjusted when the bathing bathing place remained unchanged. In the latest planning, the service room has changed from the original modern design style to the classical garden architecture style. The two sides are shorter, with two floors in the middle.
it is reported that a shallow water area in the north of the youth swimming pool will be opened up in the same area as the main swimming pool, and the total area is twice as large as that of the present young swimming pool. After the completion, the area of the spring bathing area is around 1500 square meters. At the same time, the spring bath will also be divided into deep water and shallow water, deep water depth of about two meters, shallow water depth of less than half a meter, in order to facilitate children or beginners to swim practice.
according to the plan, the spring water bath will build a water intake, 24 hours to the bathing water, water will be continuously drained out after the water is full, in order to ensure the clean water.
strive for free
before the National Day holiday. "After the completion of the spring bath, it will be open to the public free of charge." On the morning of 25, the head of the eastern moat navigation reform command said that the spring bath was open and did not plan to sell tickets. It was open to the public free of charge, so that all the spring enthusiasts could swim here and enjoy the fun of being close to the spring.
according to the introduction, the surrounding buildings of the youth swimming pool should be relocated before May 15th, but for a variety of reasons, it has not been completely relocated until now, and it has also had a certain impact on the duration of the spring bathing field.
the official told reporters that the hot weather in Ji'nan is relatively long, and the completion of the spring bath can give the public a place to enjoy the cool summer. The construction period of the East moat is very tight, and the command department also hopes to complete the demolition as soon as possible, so that the spring bath will start construction soon. If it is delayed to the autumn and winter, the effect will be greatly weakened, and it will also make the public feel regretful.
according to the introduction, if the project is successful, the first spring garden with garden style will be met with the public in October this year.