Implementation of emergency measures to improve and improve water quality in Xiaoqing River
newspaper of May 17th (reporter Liu Hongjie), the Xiaoqing River is still polluted from time to time due to the failure of the tributaries to cut pollution. In this regard, the provincial capital has formulated and adopted emergency measures to ensure that the quality of the Xiaoqing River and Luohe water meets the standard requirements for the stable growth of common fish as soon as possible.
it is understood that the cause of the Xiaoqing River is still polluted, one is the pollution control work of the Xiaoqing River tributaries, such as the Liu Jing River, the Taiping River, the Daxin River, the La Shan River and so on. There are about 90 thousand tons of sewage discharged into the Xiaoqing River every day; the two is that the current is in the dry period, and the supply of water source is reduced, which directly affects the river water. Dilution and purification; three, part of the rubbish enters the Xiaoqing River directly or through tributaries. After the degradation and fermentation of garbage, the river water has caused some pollution. Luohe pollution is because the water quality of the newly built Diao town sewage treatment station is still unstable, the phenomenon of exceeding the standard occurs, and there is a lack of supporting pipe network along the river and town, and the sewage is discharged directly.
in view of the current pollution situation in the Xiaoqing River, the provincial capital has formulated and implemented emergency measures: first, the sewage pipe that affected the sewage overflow to the Xingji river is all pumped back to the sewage pipe network, and the sewage pipe of Xingji river is restored as soon as possible; two is to introduce the sewage of Liu Xinghe river through the establishment of a temporary dam. Dashui river one factory, through dredging the river interception well, increasing the water pump and other measures, the Daxin River sewage is introduced into the three factory of Guangda water affairs; three is to complete the pollution control of the North Taiping River by combining the two phase of the Xiaoqing River comprehensive treatment project; four is to complete the cleaning work of the domestic garbage in the river course, and to formulate the long effective measures to stop the river to the river. Dumping of domestic waste; five, the environmental protection department will increase environmental supervision over the industrial area of Wang's Industrial Park, so as to ensure the stable discharge of the relevant enterprises.
in view of the current pollution situation in Luohe, the relevant departments will strengthen the operation and management of the Zhangqiu sewage treatment plant and Diao town sewage treatment station, improve the processing level of the process, and urge the coastal villages and towns to take the construction of temporary dam and other measures to eliminate the domestic sewage straight to Luohe, and to accelerate the construction of the township sewage treatment station.